YMCA – Lurgan

mha were appointed by Armagh City, Banbridge and Craigavon Borough Council in 2015 to provide an internal fitout by demolition of 2 no. existing ground floor units into 1 no. commercial office facility with new shop front for Daly Park Accountants. The new facility allowed for reception and waiting area, pen plan working space, offices, […]

Donnelly Group, M1 Motorstore, Dungannon

mha were appointed in 2011 to design and project manage the new motorstore complex for the Donnelly Group on the existing Glengannon Hotel site, Dungannon. This scheme included the master planning for the Vauxhall and Fiat Motorstores. This new build scheme was the first Vauxhall showroom in Northern Ireland which used their new ‘Delta’ branding […]

Bannside Pharmacy, Portglenone

mha were commissioned to enlarge and refurbish an existing pharmacy in 1999. The extension was achieved by incorporating and integrating an existing, adjacent vacant building. In 2000 this pharmacy’s design was recognised as a winning proposal in the UK wide “Fit Out for the Millennium” C+D awards sponsored by the prestigious online trade magazine, Chemist […]

Cookstown Recycling Centre

mha designed and project managed a new recycling centre for Cookstown District Council in 2011. The elongated simple form of the portal-framed structure and dark, minimalist cladding sought to reflect the utilitarian nature of the building while also incorporating sustainability features such rain water harvesting.

Muldoon Engineering, Dungannon

mha were commissioned in 1999 to provide architectural and project management services to create a new 125 sq/m factory space for the construction of agricultural trailers.