mha were appointed by Phoenix Area Boxing Club in association with Irish Athletic Boxing Club to demolish and clear away the existing boxing club and construct a new building, steel portal frame with hipped apex roof. The external envelope was a combination of insulated panels cladding and engineering brock with PPC aluminium framed windows throughout.